Home
  • Home

 

Contact Information

Donald Hester
Washington State Licensed Home Inspector #647
WSDA#80050
InterNachi Member #NACHI10022401
509-670-9572

Contact Us

 

  • Home
  • About Me
  • Inspection Agreement- Clients
  • Blog
  • Contact Us
  • Foundation Certifications (order online)
  • Inspection Photo Gallery
  • Infrared Thermography
  • Links (businesses and resources)
  • Pricing
  • Sample Reports
  • What's Inspected
  • Building Code Questions
  • Washington State Standards of Practice
  • Qualifications
  • Areas Served
  • Sources
  • Product Recall Information and Resources
  • FAQ's
  • General Home Information
  • Homeowner Maintenace and Safety Guides
  • City/County/State Building Codes
  • Contractors
  • Reference Documents
  • Testimonials
  • "How To" Page
  • Credit Card Payment
 


site search by freefind advanced


 

NCW Home Inspections LLC
On Facebook

NCW Home Inspections LLC
1 plus if you like us

Tweet

 

 

                                Certified by the International Association of Certified Home Inspectors - Click here to verify.                               

 

  
Read Unbiased Consumer Reviews Online at AngiesList.com
Check our Home Inspection Reviews
on Angie's List

Blogs

Bonding of other systems, Intersystem bonding what you need to know.

Submitted by DonHester on Wed, 08/27/2014 - 16:05.


Bonding of other systems, Intersystem bonding what you need to know. Wenatchee Home Inspection


Proper bonding is one of the most crucial mechanisms when it come to safer electrical installations.  By bonding all systems together this will help reduce potential induced electrical ( knows as voltage ) differences between the homes power and communication equipment, such as phone, cable and satellite. These differences can come from lightning, accidental energizing and even static energy.

Another issue with more and more sensitive electronic equipment proper bonding  (and grounding) is even more important. So proper bonding is not only a safety issue, but also helps protect that electrical equipment from negative electrical effects on sensitive electronics.

Intersystem Bonding Terminal

So in the 2008 electrical code it became a requirement to install what is called an intersystem bonding termination.

From the 2008 NEC Handbook- “The code requires that separate systems be bonded together to reduce the difference of potential between them due to lightning or accidental contact with power lines. Lightning protection systems, communications, radio and TV, and CATV systems must be bonded together to minimize the potential differences between the systems. Lack of interconnection can result in a severe shock and fire hazard.”

( IBT on new Construction)

From the 2014 NEC-                      

250.94 Bonding for Other Systems

An intersystem bonding termination for connecting intersystem bonding conductors required for other systems shall be provided external to enclosures at the service equipment or metering equipment enclosure and at the disconnecting means for any additional buildings or structures.

The intersystem bonding termination shall comply with the following:

  • Be accessible for connection and inspection.

  • Consist of a set of terminals with the capacity for connection of not less than three intersystem bonding conductors.

  • Not interfere with opening the enclosure for a service, building or structure disconnecting means, or metering equipment.



Bonding to metal conduit at meter


In homes built prior to the  Intersystem Bonding Termination requirement. The grounding conductor and any antenna discharge unit must terminate to the nearest accessible location in the following locations:

  • Building or structure grounding electrode system [250.50].

  • Interior metal water piping system, within 5 ft from its point of entrance [250.52(A)(1)].

  • Accessible means external to the building, as covered in 250.94.

  • Metallic service raceway.

  • Service equipment enclosure.

  • Grounding electrode conductor or the grounding electrode conductor metal enclosure.

Bonding requirements for other systems does go back a ways, in 1981 NEC 250.71 (b) was the first occurrence of this specific code provision.

When doing home inspection I am always evaluating these bonding areas to see if they are performed correctly. It does not really matter if these systems where installed prior to these requirements the danger is still there and should be corrected.

Here is an example of of communication system going to an independent ground rod. Well this one is very independent since the grounding conductor has come loose. These independent ground rods need to be bonded to the main grounding electrode system even if they were installed before these requirements to prevent potential electrical differences.


“If you think it's expensive to hire a professional to do the job, wait until you hire an amateur.”

Red Adair




NCW Home Inspections, LLC  is a Licensed Washington State Home Inspection service located in Wenatchee Washington serving Chelan County, Douglas County, Kittitas County, Okanogan County and Grant County Washington and the cities of Wenatchee, Leavenworth, Cashmere, Oroville, Cle Elum, East Wenatchee, Quincy and many more…  

Your Wenatchee and Chelan Professional Real Estate, Home and Structural Pest Inspection Service

www.ncwhomeinspections.com                                                   509-670-9572


You can follow me on Facebook, Twitter, Google+ and on my website Blog.

»
  • DonHester's blog
« first‹ previous…143144145146147148149150151…next ›last »
Syndicate content

NCW Home Inspections, LLC Serving Chelan, Douglas, Okanogan, Kittitas and Grant Counties.
copyright North Central Washington Home Inspections, LLC 2016

ncwhomeinspections@gmail.com



Website hosted by Home Inspector Pro Home Inspection Software - Admin Login